Garments Quality ManagementSystem (QMS)
A garment manufacturing quality management system (QMS) is related to quality control and assurance system that documents (quality manual) processes (Online and offline), procedures, system, planning, responsibilities, and task for achieving quality goals and policies to meet buyer requirements. A quality management system is focused on customer requirements and satisfaction through combine effort of whole organization management by setting up a work standard.
A quality management system helps a factory to coordinate and instruct an organization’s functions/activities to meet buyer requirements and improve its effectiveness and efficiency on a continuous basis quality control and improvement. Good quality management can guide a factory to the right path of quality goal, to keep standard of export garments quality; a good quality management system should be implemented.
![Quality Management System in Garments Manufacturing - ORDNUR (1) Quality Management System in Garments Manufacturing - ORDNUR (1)](https://i0.wp.com/i0.wp.com/ordnur.com/wp-content/uploads/2019/03/Quality-Management-System-in-Garments-Manufacturing-1024x620.png?resize=692%2C419)
Key Factorsof Garments Quality Management
- Proper reporting
- Strict Materials inspection
- Approved trim card
- Keeping pattern log, library and evaluation report
- Calibrate machine, process, and manpower
- Follow SOP and Keeping version names
- Visualize quality tools, sample, and metrics
- Process a
udit or AQL inspection - Keeping packing approval
- Zero defects station
- Review quality result and taking corrective action
- Training and evaluate QC
- Internal pre-final Audit before Final Inspection
Proper Reporting
Quality department’s firstresponsibility is reporting, and then taking action. If they report is doingproperly, easy to work on it.
Strict Materials Inspection
Most of times needed raw materialslike fabrics; accessories of a garment need to buy from a supplier, so it’simportant to inspect all raw materials and ask supplier if there any defects.Because once you make a garment, it’s almost impossible to replace if theirfaulty fabrics or trims.
ApprovedTrim Card
Following approved Trim card in store,cutting, sewing and finishing ensuring correct materials and fabrics arejoining for every lot.
KeepingPattern Log, Library and Evaluation Report
Pattern is very sensitive, standard is to keep a patternlibrary, track and change log of every stage as like before and after size set.
Calibrate Machine,Process and Manpower
Yearly or half yearly calibration of machines to check machineis fit enough, performing well or not. Need to check calibration by 3rdparty or machine supplier of CAD plotter, Fabrics inspection machine, shadingchecking light box, Fusing machine, needle detector machine, pull testing machineand others lab testing machines.
Follow SOPand Keeping Version Names
Follow a SOP for every process and section, keeping SOPchange log and version name. ISO method is to keep SOP version name.
VisualizeQuality Tools, Sample and Metrics
Visualizing all quality tools, analysis, and quality metricswill make aware about everyone’s performance and responsibilities will help totake decision easily.
ProcessAudit or AQL Inspection
Inspection garments by AQL audit system before movinggarments to next step or process to check process accuracy, passing goods fromevery section by passing in audit, if audit fail goods back for reprocessing.
KeepingPacking Approval
A system to approve a garment by authorize person (buyer QC,merchandiser or QA manager) before start packing of every lot
Zero DefectsStation
Set up zero defect station by through 100% garments qualityinspection in sewing and finishing.
ReviewQuality Result and Taking Corrective Action
Review every sections quality result by a daily or weekly basis and taking corrective action to not to happen and improve in the future. A general meeting can be called with related production and maintenance department and giving responsibilities to improve quality as a part of corrective action.
Trainingand Evaluate QC
Training is one of the major part garments quality management, Kaoru Ishikawa said: “Quality control starts and ends with training.” Continuously train up whole quality team about various quality matters and evaluate their understanding.
Internal Pre-FinalAudit before Final Inspection
Pre-final Audit or an audit before Final quality inspectionprocedure as per final inspection procedure to confirms final inspection willbe passed of every lot.
Related articles you may love to read
- Garmentsquality control procedure
- Garmentsquality SOP
- Garmentsquality check points and their quality control
- Garmentsquality manual
- Garmentsquality organogram
Quality Management System in Garments Manufacturing